Building or developing in the Hunter Water area?

Need help with a Section 50 Compliance Certificate? Send Opal Water Management your project details and plans, and we’ll guide you through the requirements.

Get started with your Hunter Water enquiry

🇦🇺 +61
Click to attach architectural plans, DBYD, or DA conditions

Immediate lodgement to Senior Water Service Coordinators

Hunter Water Section 50 Approvals

A Section 50 Compliance Certificate confirms you have met Hunter Water's servicing requirements so your new development or land subdivision can be adequately served with drinking water, recycled water, stormwater and wastewater infrastructure.

Opal Water Management is a Registered Accredited Design Consultant within the Hunter Water Network. This accreditation enables our technical team to design and manage the installation of water and sewer reticulation systems throughout Newcastle, Lake Macquarie, Maitland, Cessnock, Port Stephens and the broader Hunter region.

When you develop or subdivide land, local councils and certifiers mandate a Section 50 compliance certificate before issuing final subdivision linen plans or occupation certificates. Our team also provides underground sewer location and asset identification to ensure zero pipe damage or unexpected costs during building.

Accreditation & Statutory Clearance

Opal Water Management is a Registered Accredited Design Consultant within the Hunter Water Network, providing certified water and sewer design and project management across Newcastle and the Hunter region.

Who This Service Is For

  • Dual Occupancy and multi-dwelling residential developers in the Hunter region
  • Land developers executing residential, commercial or industrial land subdivisions
  • Commercial and industrial builders constructing new premises or executing site fit-outs
  • Property owners undertaking alterations, additions or change-of-use developments in Hunter Water zones

How Opal Water Management Assists

01

Initial Section 50 servicing assessment and formal lodgement with Hunter Water.

02

Technical design and engineering coordination for required water and sewer reticulation extensions.

03

Underground sewer location, CCTV pipe inspection and asset protection identification.

04

Management of construction compliance and direct clearance coordination to obtain the Section 50 Certificate.

What to Provide With Your Enquiry

To assess your project promptly, please supply as much of the following as you have available. You can attach these documents directly in the enquiry form above.

  • Proposed architectural plans, site survey or subdivision layout (PDF or DWG)
  • Council Development Consent (DA) or Complying Development Certificate (CDC) conditions
  • Site address, Lot/DP numbers and existing servicing details if known
  • Target construction timeline and any prior Hunter Water correspondence

Key Deliverables & Documentation

  • Hunter Water Section 50 Compliance Application Lodgement
  • Accredited Water & Sewer Reticulation Engineering Designs
  • Underground Pipe Location & Asset Protection Reports
  • Final Hunter Water Section 50 Compliance Certificate

Prefer a Direct Discussion?

Speak directly with an accredited Water Service Coordinator at our Sydney HQ or Regional Dubbo hub.